MSG Team's other articles

11464 Switching Over From Socialism to Capitalism

Socialism is a failed idea. Many nations in the world have now tried socialism. It is no surprise that all of them have failed. After the World War-2, the world was divided into two lobbies. There was the capitalist lobby led by the United States. Then, there was the socialist lobby which was led by […]

10057 Information Technology – A Key Driver of SCM

Supply Chain Management is a broad-based function that encompasses all business and operational processes involved in but not limited to Procurement, Manufacturing, and Finished Goods Transportation, warehousing & Distribution and Inventory Management. In a globalized business scenario characterized by Geographically spread markets, raw material procurement sources across the world and cheaper manufacturing and labor markets […]

12034 Why Wealth Tax has been Abolished All Over the World?

Taxation is a hotly debated subject all over the world. There are supporters of capitalism who already believe that the rich are being taxed too much. On the other hand, there are supporters of socialism who cite increasing wealth disparity and argue that the rich should be taxed even more. The idea that the rich […]

9778 Identify the Vital Inputs in Six Sigma Project

The list derived from the detailed process map needs to be shortlisted. This can be done in multiple ways. The different tools that are commonly used in six sigma projects to meet the purpose have been written down. They are as follows: Cause Effect Matrix: The cause and effect matrix takes the list of inputs […]

10817 Pros and Cons of Opportunity Zones in America

President Trump introduced one of the biggest tax reforms that the United States has ever seen in Dec 2017. As soon as the plan declared that the taxes on the rich will be reduced by $1.5 trillion, a huge debate started about the morality and the perceived economic benefits of such a move. However, it […]

Search with tags

  • No tags available.

Shift in the Process: A shift in the process is defined as a pattern in which seven consecutive data points appear on only one side of the mean. Statistical studies have shown that if the number of points on one side of the mean is less than 7 then it is not a non-random pattern and could have occurred due to random causes.

A shift in the process is very important for the management to detect. This is because it signifies that the average of the process has moved to a different level. Therefore, the control chart with the mean and control specifications based on old measures is redundant and will give wrong information. It is for this reason that it is important for the organization to detect this pattern as early as possible and take corresponding measures. The most common causes of the appearance of non- random shift patterns is as follows:

Process Improvement: Shifts in process means usually happen as a result of a deliberate attempt through a process improvement initiative. The best practises to do any task are continuously evolving. Introduction of new technologies enables newer and better ways of performing the work. This pattern can be detected on the control charts and the process improvement can be institutionalised.

Introduction of New Inputs: Another common reason for shift in the process mean is the introduction of new inputs. These new inputs could be markedly better or worse than the inputs used earlier and as a result change the performance of the entire process

Change in Quality Control Measures: The shift could also be the result of a change in quality control measures. The thrust may have changed from cure to prevention and as a result the quality checks may have dramatically improved the process, shifting its mean.

Two out of three points at Two Sigma or Beyond

As the name suggests, this may be quite straightforward. However the logic behind this pattern is interesting. The normal curve states that 95% of all data points will lie between 2 standard deviations. However, if 2 out of 3 consecutive points are lying on or above the standard deviation, we can be rest assured that the 95% criteria is not being met, at least in that point in time.

This is therefore an early sign to the management that the process may be about to go out of control. A thoughtful management will make corrective action plans that will look into the process, understand the issue and correct it as soon as possible.

Article Written by

MSG Team

An insightful writer passionate about sharing expertise, trends, and tips, dedicated to inspiring and informing readers through engaging and thoughtful content.

Leave a reply

Your email address will not be published. Required fields are marked *

Related Articles

Conducting the Knowledge Transfer

MSG Team

Closing a Six Sigma Project

MSG Team

Step 3B: Choosing the Correct Control Chart (Continuous Data)

MSG Team