What is Aggregate Planning? – Importance and its Strategies
February 12, 2025
Enterprise Resource Planning (ERP) and Business Process Re-engineering (BPR) evolved almost at the same time i.e. 1st half of 1990. Both relates to radical redesign of an organization at a relatively short period. Both are having the primary intend to optimize workflow and improve productivity. But, the chicken and egg question remained, whether an organization […]
What is the P-Value ? The P-Value is a statistical representation of the likelihood that the null hypothesis is true. Therefore the P-Value is the probability that the output (Y) will not change as a result of the variation that we are deliberately introducing in the input (X). Example: If we have a null hypothesis […]
How Culture Impacts Cross Border Mergers and Acquisitions With the advent of globalization, it has become common for western multinationals to indulge in mergers and acquisitions with companies in the emerging markets. The process of entering those markets is usually through the Greenfield route that entails huge investments and takes time as the plants and […]
Adoption of quality frameworks like Six Sigma, ISO 9000 and Baldridge has ensured that companies derive a source of competitive advantage in the way in which they produce superior products with minimal loss of quality. Though these frameworks have been adopted in the manufacturing sector much earlier, the services sector has not lagged behind in […]
Introduction: The Problem of Piracy No discussion on intellectual property rights (IPR) is complete without mentioning the problem of piracy around the world. Piracy is defined as the copying, stealing, reproducing, transmitting, and selling of the intellectual property (IP) of an individual without his or her express consent and written approval as well as without […]
The production system design planning considers input requirements, conversion process and output. After considering the forecast and long-term planning organization should undertake capacity planning.
Capacity is defined as the ability to achieve, store or produce. For an organization, capacity would be the ability of a given system to produce output within the specific time period. In operations, management capacity is referred as an amount of the input resources available to produce relative output over period of time.
In general, terms capacity is referred as maximum production capacity, which can be attained within a normal working schedule.
Capacity planning is essential to be determining optimum utilization of resource and plays an important role decision-making process, for example, extension of existing operations, modification to product lines, starting new products, etc.
A technique used to identify and measure overall capacity of production is referred to as strategic capacity planning. Strategic capacity planning is utilized for capital intensive resource like plant, machinery, labor, etc.
Strategic capacity planning is essential as it helps the organization in meeting the future requirements of the organization. Planning ensures that operating cost are maintained at a minimum possible level without affecting the quality. It ensures the organization remain competitive and can achieve the long-term growth plan.
Capacity planning based on the timeline is classified into three main categories long range, medium range and short range.
Production capacity is the maximum output possible from equipment under normal working condition or day.
Sustainable capacity is the maximum production level achievable in realistic work condition and considering normal machine breakdown, maintenance, etc.
Effective capacity is the optimum production level under pre-defined job and work-schedules, normal machine breakdown, maintenance, etc.
The ultimate goal of capacity planning is to meet the current and future level of the requirement at a minimal wastage. The three types of capacity planning based on goal are lead capacity planning, lag strategy planning and match strategy planning.
Effective capacity planning is dependent upon factors like production facility (layout, design, and location), product line or matrix, production technology, human capital (job design, compensation), operational structure (scheduling, quality assurance) and external structure ( policy, safety regulations)
There would be a scenario where capacity planning done on a basis of forecasting may not exactly match.