What is Aggregate Planning? – Importance and its Strategies
February 12, 2025
The Project lead is the second most important person in the entire Six Sigma project exercise. The Project lead reports to the Project Champion. The Project Lead is also selected by the Project Champion to execute a given Six Sigma project. The role and responsibility of a Six Sigma project lead have been listed below: […]
The price of drugs is going through the roof in America. This is also the case in many developing nations. In general, people are simply unable to afford healthcare if they do not have insurance. In developing nations, having insurance is not the norm. Hence, when patients are faced with high medical bills, some of […]
Introduction It is often observed that term information system and information technology are used interchangeably. In a literal sense, information technology is a subset of information systems. Information systems consist of people, processes, machines and information technology. The great advancement in information systems is due to development in information technology and introduction of computers. Information […]
The US Fed and Tapering of Quantitative Easing (QE) The recent announcement that the United States Federal Reserve was thinking of tapering the Quantitative Easing program or QE immediately spooked the stock markets, which went into free fall. Mind you, this was not the actual tapering off the program but just a line of thought. […]
What is a Project Charter ? A Project charter is a 5 to 6 page document which collects all the information that has been developed in the previous steps and puts it in a central location. The Project charter serves as the constitution which governs the working of the project and disputes if any that […]
The production system design planning considers input requirements, conversion process and output. After considering the forecast and long-term planning organization should undertake capacity planning.
Capacity is defined as the ability to achieve, store or produce. For an organization, capacity would be the ability of a given system to produce output within the specific time period. In operations, management capacity is referred as an amount of the input resources available to produce relative output over period of time.
In general, terms capacity is referred as maximum production capacity, which can be attained within a normal working schedule.
Capacity planning is essential to be determining optimum utilization of resource and plays an important role decision-making process, for example, extension of existing operations, modification to product lines, starting new products, etc.
A technique used to identify and measure overall capacity of production is referred to as strategic capacity planning. Strategic capacity planning is utilized for capital intensive resource like plant, machinery, labor, etc.
Strategic capacity planning is essential as it helps the organization in meeting the future requirements of the organization. Planning ensures that operating cost are maintained at a minimum possible level without affecting the quality. It ensures the organization remain competitive and can achieve the long-term growth plan.
Capacity planning based on the timeline is classified into three main categories long range, medium range and short range.
Production capacity is the maximum output possible from equipment under normal working condition or day.
Sustainable capacity is the maximum production level achievable in realistic work condition and considering normal machine breakdown, maintenance, etc.
Effective capacity is the optimum production level under pre-defined job and work-schedules, normal machine breakdown, maintenance, etc.
The ultimate goal of capacity planning is to meet the current and future level of the requirement at a minimal wastage. The three types of capacity planning based on goal are lead capacity planning, lag strategy planning and match strategy planning.
Effective capacity planning is dependent upon factors like production facility (layout, design, and location), product line or matrix, production technology, human capital (job design, compensation), operational structure (scheduling, quality assurance) and external structure ( policy, safety regulations)
There would be a scenario where capacity planning done on a basis of forecasting may not exactly match.